Bernhard Schulte Shipmanagement Takes Delivery of First Methanol Dual-Fuel Bulk Carrier
29 Jan 2026 - News
Published on 20 Jun 2023
At the end of a long river pilotage, the ship was about a mile from the berth and proceeding at slow ahead whilst awaiting tugs. The pilot ordered ‘half astern’, but the engine failed to kick astern. After waiting a few seconds, the telegraph was moved to ‘stop’. The air pressure in the starting air cylinders decreased to 12bar. After waiting a few seconds, a further attempt was made, but again the engine failed to start. The pressure in the starting air cylinders dropped to 7bar. Attempts to contact the engine control room were unsuccessful, as nobody answered the telephone. After a further short period, the pressure in the air start cylinders was seen to increase to 22bar. The telegraph was moved to ‘half astern’ and the main engine responded and started to run astern. After this, there were no further issues.
The subsequent onboard investigation revealed that the new Chief engineer had closed the valve between the two start air cylinders. He, however, did not inform anyone about his actions. His intention was to have one start air cylinder full and ready for use in emergency.
A C/E can run the E/R in whatever configuration he believes to be the best and safest but adhering to statutory and SMS requirements. However, when changing an existing arrangement, it is the C/E’s responsibility to inform all members of the E/R team of the change. Sadly, on this occasion, that did not happen. Avoid isolation of engine room starting air receivers as this can minimise the ‘consecutive’ starts of the ME which is required by the IACS rules.
Another worrying aspect was that the engine control room was left unattended during manoeuvring / pilotage operations. At least one person must remain in the engine control room during pilotage to answer the telephone. The E/R staff must remain in close contact with the bridge team when maneuvering or during pilotage.
29 Jan 2026 - News
05 Dec 2025 - News
BSM, in partnership with Schulte Group member OceanOpt, has won the Greenhouse Gas Project of the Year at the IMCA Annual Awards 2025. The ceremony was held during the Global Summit in Kuala Lumpur on 26 November.
05 Dec 2025 - News | Articles | Articles
19 Nov 2025 - News | Articles | Articles
17 Nov 2025 - News | Articles | Articles
27 Oct 2025 - News | Articles | Articles
As the maritime industry accelerates its transition toward sustainable energy solutions, Bernhard Schulte Shipmanagement (BSM) is proud to announce a significant milestone in crew training and safety innovation: the successful launch of bespoke Methanol as Fuel Courses, including the specialised Methanol Firefighting Course, across its global Maritime Training Centres (MTCs).
30 Sep 2025 - News | Articles | Articles
01 Sep 2025 - News
We are thrilled to announce the renewal of our partnership with Treedom, a global NGO dedicated to reforestation and community empowerment. Together, until the end of 2024, we have planted 5,100 trees across 5 countries, absorbing 2,443 tonnes of CO₂, a major step toward a more sustainable planet!
03 Jul 2025 - News | Articles | Articles
02 Jul 2025 - News | Articles | Articles
17 Jun 2025 - News | Articles | Articles
The BSM Hellas Ship Management Centre (SMC) in Greece, proudly marks its 20th anniversary this year.
10 Jun 2025 - News | Articles | Articles
Bernhard Schulte Shipmanagement (BSM) proudly participated in the IMCA Dynamic Positioning Conference 2025, held on 3–4 June in Istanbul, Turkey. This premier global event brought together over 120 professionals from the offshore and maritime sectors, including experts in offshore wind, oil and gas, marine engineering, and vessel design.
27 May 2025 - News | Articles | Articles
05 May 2025 - News | Articles | Articles
16 Apr 2025 - News | Articles | Articles